2187
Henryk Makarewicz
Construction of residential buildings on the A-33 (Hutnicze) Estate. From 1954 on, the first phase of industrialisation was introduced on the construction sites in Nowa Huta, traditional buildings techniques (bricks, wooden roof trusses) were replaced by prefabricated elements of all horizontal parts: ceilings, staircases, roofs and pillars. Heavy cranes started to be used on construction sites. The A-11 Estate was the first to be built of such materials. They were soon used on other estates: A-33 (Hutnicze), B-33 (Słoneczne) and C-33 (Urocze), architectural supervision of the A-11 Estate was performed by architect Zbigniew Olszakowski, who collaborated with architect Zbigniew Sieradzkion particular buildings. 1950s. Budowa domów mieszkalnych na osiedlu A-33 (Hutnicze). Począwszy od 1954 roku na budowach nowohuckich osiedli wprowadzony został tak zwany pierwszy stopień uprzemysłowienia, tradycyjne materiały i metody budowlane (cegły, drewniane więźby dachowe) zostały zastąpione prefabrykatami wszystkich, poziomych elementów budowli: stropów, klatek schodowych, stropów, dachów i słupów. Zaczęto również używać na budowie ciężkich żurawi. Pierwszym osiedlem na którym na szerszą skalę zastosowano te materiały oraz technologie było osiedle A-11. Następnie bardzo szybko zaczęto je wprowadzać na budowach osiedli: A-33 (Hutnicze), B-33 (Słoneczne) oraz C-33 (Urocze), architektoniczny nadzór autorski m.in.: nad osiedlem A-11 pełnił inż. arch. Zbigniew Olszakowski, nad poszczególnymi budynkami współpracował z nim inż. arch. Zbigniew Sieradzki, l. 50. XX w. Photo by Henryk Makarewicz/idealcity.pl
Miejsce
Nowa Huta
Czas
2 May 1955
Tagi
construction, Hutnicze Estate, prefabrication
GPS
50.072258, 20.044187

Geolokalizacja

Twoje notatki